Backup Changes

I was studying for my 70-290 this weekend by reading through some chapters in my Microsoft Press book. As I was reading and actually beginning to understand some of the backup information, I realized I need to make a couple of changes to my backup schedule here at work.

I was again convinced that I need to do a bi-weekly normal/full backup of the main graphics server, and then run Differential backups each night for the next two weeks. This insures that I need only the full backup tapes (of which there are 2) and the differential tape in case of a system failure.

I thought I had set this, but it turns out I was running incremental backups and so I switched that today.

I also turned off the verify switch. I had sort of thought before that I didn't really need to do it, but with the new tapes I just got, it seems silly.


Spooler Changes
I changed the location of the spooler on the main server. It was on the C drive, it is now on E:\spool\PRINTERS.